Project procurement for EPC contractors
At project and container scale, a wrong supplier is a schedule and budget hit you can't absorb. We verify manufacturers and oversee QC for solar, BESS and steel so your BOQ arrives as specified.
Where EPC procurement goes wrong
- Suppliers who pass on paper but can't hold spec or schedule at project volume.
- Equipment that fails inspection after it's too late to swap — blowing the construction timeline.
- Juggling multiple factories, forwarders and customs agents with no single owner.
One partner from BOQ to site
- 1
Verify at project scale
On-site audits of capacity, certifications and track record before you commit.
- 2
Match spec to BOQ
We align factory output to your technical spec and required certifications.
- 3
Inspect every shipment
Independent pre-shipment QC with photo reports before the balance is released.
- 4
Coordinate delivery to site
Consolidated freight, documentation and customs to your project location.
Projects we've supplied
Energy storageContainerised battery storage, factory-checked for the UAE
Sourcing a containerised battery energy storage system from abroad felt risky. We had our team walk the factory floor in Beijing, verify the build, and check the modules before shipment to the UAE.
View case study
Solar energySolar modules and inverters, mill-checked for Poland
A solar EPC was about to buy from a 'factory' that turned out to be a trading company. We found the real manufacturer, verified the line, and shipped a full container of modules and inverters — inspected, with no customs surprises.
View case study
Steel & metalsGalvanized steel coil, mill-direct to Egypt
An importer kept getting trader quotes for galvanized coil. We took them straight to the mill, verified it on-site, and had the coils inspected before the balance was paid.
View case study